Assessment methodologyDRP-2.1

Application disaster recovery classification methodology

Use six business impact factors to determine recovery requirements. Review the standards references, choose scores against defined facts, and trace how RTO, RPO and the internal recovery tier are calculated.

STANDARDS REFERENCES, EXPLICIT PROJECT RULES

Which disaster recovery standard should you use?

For international planning, use ISO/IEC 27031:2025 for ICT readiness for business continuity, supported by ISO 22301 and NIST contingency-planning guidance. Select the relevant reference for each project; it stays with the confirmed report.

01

International · ISO and NIST

ISO/IEC 27031:2025 addresses ICT readiness; ISO 22301:2019 addresses the business continuity management system. NIST SP 800-34 Rev. 1 provides contingency-planning and BIA guidance. Choose the requirements relevant to your organization and contracts.

02

China · GB/T 20988-2025

Cybersecurity technology — Disaster recovery specifications for information systems. Effective January 1, 2026. Use it as the primary reference for China-focused disaster recovery planning and consult the applicable requirements in the published standard.

The report defines the recovery targets your business needs. Demonstrating that current systems meet a standard requires a separate review of infrastructure, operational records and recovery exercises.

Review the scoring criteria

Six factors. Specific business facts.

Assess all six factors using their factual 1–5 scales and record the evidence for each answer. Recovery targets follow the applicable time constraints; weights show each factor’s contribution to business impact.

F1

Financial impact

What happens to revenue and contractual obligations during a peak-hour outage?

ScoreBusiness factDefault rule effect
1No direct revenue loss or contractual penalty.No additional RTO constraint.
2Loss below 1% of daily revenue.No additional RTO constraint.
3Loss from 1% to under 5% of daily revenue, or a minor service credit.RTO ≤ 12 hours.
4Loss of 5%–20% of daily revenue, or a major customer claim.RTO ≤ 2 hours.
5Loss above 20% of daily revenue, or the primary collection or delivery channel stops.RTO ≤ 15 minutes.

Evidence to collect: Fix the company or business-unit daily revenue denominator before assessment. Record the source and peak-hour assumption.

RTO

How soon must the service recover?

Start with the longest interruption the business can tolerate and describe what counts as restored service.

  1. 1Describe the minimum business capability and determine the time to the business deadline.
  2. 2Reserve time for work required after minimum capability returns, such as reconciliation. Record 0 when no follow-up work is needed.
  3. 3Apply the shortest applicable recovery requirement. Record its source.

Subtract the time reserved for work after minimum capability is restored from the outage limit, then apply any tighter recovery requirement. Factor defaults provide a provisional estimate when outage facts are unavailable.

RPO

How much data can the business lose?

Determine how much confirmed business data can be lost in the stated failure scenario. Check what can be replayed, recalculated or reconstructed.

  1. 1Record the tolerable data loss in seconds. Use 0 for an exact zero-loss target.
  2. 2Compare the business window with applicable data requirements and use the shorter target.
  3. 3For 0 seconds, record the failure scenario and which confirmed records must be preserved. For a service without data to recover, record why RPO is not applicable.

Take the shorter of the tolerable business data loss window and any applicable data requirement. Use the F5 default for a provisional estimate when the business window is unavailable.

Two axes first. A combined priority second.

A–E are internal target groups. The combined grade follows the stricter axis and does not imply that both axes have that grade.

GradeRecovery time objective · RTORecovery point objective · RPO
A≤ 15 minutes0 to 60 seconds
B> 15 minutes to 2 hoursOver 60 seconds to 15 minutes
C> 2 hours to 12 hours> 15 minutes to 4 hours
D> 12 hours to 48 hours> 4 hours to 24 hours
E> 48 hoursOver 24 hours or no commitment

Read the result accurately.

  • A stricter target is a business requirement, not proof that the current recovery capability meets it.
  • These groups are not external certifications or direct mappings to a regulatory standard.
  • An optional weighted impact score helps compare services. It cannot relax either recovery target.
  • The report distinguishes an unverified data loss window, a service without data to recover, and a service with no data loss commitment.

Collect the facts before scoring.

Download the scoring guide for interviews. Open the project’s import dialog for a worksheet you can fill and import.

  • Service code, application, business unit and failure scenario.
  • A fixed revenue denominator and high-impact operating periods.
  • Applicable recovery limits, data preservation rules and incident notification deadlines.
  • Manual workarounds, replay capability and recent degradation evidence.
  • Source references, collection dates and unresolved assumptions.
Start an assessment